Hot Leaching Compaction Plant - Arab Potash

SOMETHING


Cost: USD 8.7 Million

Client: Petrojet /Arab Potash Company Ltd

Consultant: Dar Al-Handasah Consultants

Location: Potash - Ghor Al Safi

Status: 100% completed

Scope:

The project consists of 4 main aspects:

1- HLP Compaction Plant: 
  • The CP is casted by  Massive concrete mat foundations with a total concrete quantity around of 11000 m3 and 2000 tonnes of steel reinforcement 
  • CP steel structure with a composite third floor steel sheet deck to receive heavy equipment’s and machines 
  • Electromechanical works including CP drainage , oil pits, GRP lines, HDPE lines 

2- Warehouse: Consist of a 3500 m2 warehouse to receive the final product 
  • The civil works include casting over 7000 m3 in foundations, walls and slab on grade for the warehouse.
  • Relocation of firefighting pipes and GRP lines 
  • Installation of steel anchors to receive the steel structure 

3- Transportation:
  • Consist of re-constructing the roads surrounding the project and constructing new roads around 700 m